Motion Graphics Pipeline Review

HyperFrames studies · expanded use cases · Omni/H3 finishing · 300-infographic slice

Updated 2026-09-01 · static review bundle

Expanded Use Cases

Three original HyperFrames studies covering animated data and maps, broadcast graphics, and product UI motion.

3 EC2 renders · QA not run
city-flow-data-story

City Flow

Demonstrate a transit-map and operational data story with exact labels, route progression, station emphasis, and a stable overview.
animated_data_and_maphyperframes_ec210s16:9unreviewed
No public source reference bundled.
See the reconstruction notes and provenance manifest.
Design brief

Original editorial transit dashboard using three route colors, map districts, station pulses, rider-load bars, and a final network emphasis. No source reference was copied.

Rendered remotely on EC2 through SSM and S3 with HyperFrames 0.8.14, standard quality, one worker, and no audio. QA was not run.
Output
No new visual or audio QA was run for this review-site build.
matchday-broadcast-package

Matchday Control

Demonstrate a replaceable sports-broadcast package with teams, score, clock, possession, event, and player states.
broadcast_and_live_graphicshyperframes_ec210s16:9unreviewed
No public source reference bundled.
See the reconstruction notes and provenance manifest.
Design brief

Original broadcast package with a restrained charcoal, cyan, coral, ivory, and yellow system; deterministic score change; possession chart; event panel; and player lower third.

The first remote attempt was blocked by strict transform ownership checks. The project was corrected and rendered successfully on EC2. QA was not run.
Output
No new visual or audio QA was run for this review-site build.
focusflow-product-tour

FocusFlow Product Tour

Demonstrate product onboarding through deterministic task completion, progress state, cursor movement, and a final focus-mode reveal.
interactive_product_motionhyperframes_ec210s16:9unreviewed
No public source reference bundled.
See the reconstruction notes and provenance manifest.
Design brief

Original work-planning UI with a compact sidebar, three task states, progress indicator, pointer choreography, and a final focus timer. No external product design was copied.

Rendered remotely on EC2 through SSM and S3 with HyperFrames 0.8.14, standard quality, one worker, and no audio. QA was not run.
Output
No new visual or audio QA was run for this review-site build.